Brick calculator.

Enter wall length, height and thickness, deduct openings, and get the number of bricks to order with the cement and sand for the mortar.

Results
Bricks to order3,623
Bricks without wastage3,450
Wall volume6.900 m³
Cement8.7 bags
Sand1.813 m³ (64.0 ft³)
Wet mortar1.590 m³

How to use it

Step by step, with a worked example.

  1. Enter the wall length and height in metres and the thickness in millimetres. In India, 230 mm is a full-brick wall and 115 mm a half-brick wall.
  2. Add up the area of doors and windows and enter it as openings, so it is deducted from the wall.
  3. Choose the brick size and the mortar joint (10 mm is standard), then the mortar mix.
  4. Add a wastage percentage for broken bricks and read the number of bricks to order, with the cement and sand for the mortar.

Worked example

A 10 m long, 3 m high boundary wall

Inputs

  • Wall 10 m x 3 m, 230 mm thick, with a 2 m² gate opening
  • Indian modular brick 190 x 90 x 90 mm with 10 mm joints
  • 1 : 6 cement-sand mortar, 5% wastage

Working

  • Wall volume = (10 x 3 - 2) x 0.23 = 6.44 m³
  • Each brick with mortar = 0.2 x 0.1 x 0.1 m = 0.002 m³, so 6.44 / 0.002 = 3220 bricks
  • Mortar = 6.44 - 3220 x 0.001539 = 1.48 m³ wet, x 1.33 dry = 1.97 m³

Result: Order about 3,380 bricks (3,220 plus 5%), 8.1 bags of cement and 1.7 m³ of sand.

Chart

Bricks and mortar per cubic metre.

Per 1 m³ of brickwork, 10 mm joints, 1 : 6 mortar, no wastage.
BrickBricksWet mortar m³Cement bagsSand m³
India modular 190 x 90 x 90 mm5000.2311.260.263
India traditional 230 x 110 x 70 mm4340.2311.270.264
UK standard 215 x 102.5 x 65 mm5270.2451.340.280
US modular 194 x 92 x 57 mm7170.2701.480.308

Questions

Frequently asked.

How many bricks are in 1 m³ of brickwork?

With Indian modular bricks (190 x 90 x 90 mm) and 10 mm joints, each brick with mortar occupies 200 x 100 x 100 mm, so 1 m³ needs 500 bricks before wastage.

How much cement and sand is needed for 1 m³ of brickwork?

With modular bricks and 1 : 6 mortar, about 0.23 m³ of wet mortar is needed. Using a 1.33 dry factor that is roughly 1.26 bags of cement and 0.26 m³ of sand per m³ of brickwork.

Should I deduct doors and windows?

Yes. Enter the total opening area and it is subtracted from the wall face area. Lintels and bands in concrete should also be deducted on larger jobs.

How much wastage should I add?

3 to 5% is typical for bricks broken in handling and cutting. Use more for irregular walls or poor-quality bricks.

Estimate only. Mortar volume is the wall volume minus brick volume, multiplied by 1.33 for dry materials, with cement at 1440 kg/m³ in 50 kg bags. Frog filling and plaster are not included.